Contact Us
Precautions for Maintenance of Plastic Pipe Production Line
Blog

Precautions for Maintenance of Plastic Pipe Production Line

A plastic pipe production line, as a common type of pipe plastic machinery, requires regular maintenance, which must be operated in accordance with certain regulations. At the same time, it is maintained by the relevant requirements for the safety and technical performance of the corresponding equipment, which is conducive to the operation of equipment and can effectively ensure the safety of equipment and personnel.


1. It is necessary to regularly check the leakage of the pipeline and the tightening of its fasteners of the plastic pipe production line.


2. Regularly check the reliability of the lubrication system of the plastic pipe production line, and lubricate the moving parts according to the regulations. Besides, check whether the oil volume of the lubrication pump oil tank and the engine base oil tank is sufficient.


3. Frequently check whether the safety device of the plastic pipe production line machine is normal and effective, especially after changing the mold, check whether the mechanical insurance has been adjusted accordingly.


4. Regularly check the connection of the ground wire of the plastic pipe production line, the insulation of the electrical components, and the aging of the wires.


5. Regularly check the condition of the oil filter or filler of the plastic pipe production line, clean and replace it in time. In addition, always pay attention to whether the grease is contaminated and deteriorated. When the hydraulic oil turns dark brown and emits a smell, it is a manifestation of oxidative deterioration. Then the hydraulic oil should be replaced as soon as possible; when there are small black spots or transparent bright spots in the hydraulic oil, it means that there are impurities or metal powder mixed in, and it should be filtered or replaced.


6. The maintenance of important parts such as the screw and barrel of the plastic pipe production line must be carried out under the instructions.


7. Regularly maintain and repair the plastic pipe production line equipment several times according to the running time, focusing on cleaning, lubricating, adjusting, dismantling, and overhauling.



Related Plastic Extrusion Machinery
Related News